Open Distribution and Schedule
Use the distribution schedule for content that has completed the required review. Select the intended brand and channel-specific version.
Confirm the timing and preview
Check time zone, crop, line breaks, link and required context before saving.
Follow the status after the scheduled time
Look for a published or needs-attention state. Do not infer provider success only from the scheduled time passing.